How long does an electrical panel upgrade take?
Most panel upgrades are completed in one day. If utility coordination or significant rewiring is needed, it may take two days. We schedule to minimize disruption to your household.
Do I need a permit for a panel upgrade in Sacramento?
Yes. A panel upgrade always requires a permit and inspection in Sacramento and surrounding cities. This protects you and ensures the work meets California electrical code. We handle permit applications and coordinate inspections.
How much does a panel upgrade cost in Sacramento?
Panel upgrade costs vary based on the size of the upgrade, the brand of panel, permit fees, and any additional work needed. We provide free, detailed estimates upfront — no surprises.
What size panel do I need for my Sacramento home?
Most modern homes are well-served by a 200-amp panel. Homes with electric vehicles, central air conditioning, and smart appliances will especially benefit from 200A service. We assess your specific load requirements and recommend the right size.
Is my Federal Pacific or Zinsco panel dangerous?
Federal Pacific Stab-Lok and Zinsco panels have documented safety issues and should be replaced. If you have one of these panels, call us for an assessment. We can replace it with a modern, safe panel from a reputable manufacturer.